Mostrar el registro sencillo del ítem
Flexible Scheduling in a CPG Company
dc.contributor.author | Ardila Barreto, Natalia | |
dc.contributor.author | Perez Santillan, Alejandro | |
dc.contributor.author | Tablado, Francisco | |
dc.date.accessioned | 2014-05-06T19:23:09Z | |
dc.date.available | 2014-05-06T19:23:09Z | |
dc.date.created | 2014 | |
dc.date.issued | 2014-05-06 | |
dc.identifier.citation | CPG company DBNR presentation, November 2013 | |
dc.identifier.citation | Watson, M., Lewis, S., Cacioppi, P., Jayaraman, J:, 2012, “Supply Chain Network Design: Applying Optimization and Analytics to the Global Supply Chain” | |
dc.identifier.citation | Shapiro, J.F., 2009, “Modeling the Supply” | |
dc.identifier.citation | Chopra, S.,Meindl, P. 2012, Supply Chain Management: Strategy, planning and Operation, | |
dc.identifier.citation | Ghiani, G., Laporte, G., Musmanno, R,. “Introduction to Logistics Systems Planning and Control” | |
dc.identifier.citation | Fisher, M.L., and Jaikumar, R. (1981), "A generalized assignment heuristic for vehicle routing", Networks 11, 109-124. | |
dc.identifier.citation | Baisley J.E (1982) “Route First – Cluster Second Methods for Vehicle Routing” | |
dc.identifier.citation | Pinedo, Michael L., 2009, “Planning and Scheduling in Manufacturing and Services” | |
dc.identifier.citation | Kempf, Karl G, Keskinocak, P., Uszoy, R., Planning Production and Inventories in the Extended Enterprise | |
dc.identifier.uri | http://hdl.handle.net/10818/10495 | |
dc.description | 11 Páginas. | |
dc.description.abstract | In fast growing markets like Latin America, supply networks are required to be flexible and responsive while keeping low inventory levels. The scope of this project is to identify key variables that could help a CPG company significantly reduce the Days Between Next Run (DBNR) metric, and to develop a model or process to assess and test how changing these variables would impact the production cycle and the associated inventory levels reducing the need for safety stock in the whole supply chain. By applying rescheduling model runs with high volume or long cycle time that affect the measure of DBNR will be reduced by split them achieving a reduction of current metric from 12 to 9 DBNR. | es_CO |
dc.language.iso | eng | es_CO |
dc.publisher | Universidad de La Sabana | |
dc.source | Universidad de La Sabana | |
dc.source | Intellectum Repositorio Universidad de La Sabana | |
dc.subject | Mercados -- América Latina | |
dc.subject | Inventarios -- Empresas -- América Latina | |
dc.subject | Cadena de suministros -- América Latina | |
dc.title | Flexible Scheduling in a CPG Company | es_CO |
dc.type | bachelorThesis | |
dc.publisher.program | Especialización en Gerencia Logística | |
dc.publisher.department | Facultad de Ingeniería | |
dc.identifier.local | 259313 | |
dc.identifier.local | TE06444 | |
dc.type.local | Tesis de especialización | |
dc.type.hasVersion | publishedVersion | |
dc.rights.accessRights | openAccess | |
dc.creator.degree | Especialista en Gerencia Logística |