• English
    • español
    • português (Brasil)
  • English 
    • English
    • español
    • português (Brasil)
  • Login
View Item 
  •   DSpace Home
  • 1-Trabajos de Grado
  • Trabajos de Grado
  • Posgrado - Especializaciones, Maestrías y Doctorados
  • Especialización en Gerencia Logística
  • View Item
  •   DSpace Home
  • 1-Trabajos de Grado
  • Trabajos de Grado
  • Posgrado - Especializaciones, Maestrías y Doctorados
  • Especialización en Gerencia Logística
  • View Item

Contacto

Twitter

Facebook

Youtube

Streaming

JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

All of DSpaceCommunities and CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

What you need to know

What is IntellectumPerfil de investigadorPolicies

Autofile of works

Who can publish?Publish your documentsUpload your degree workTerms and conditions of use

My Account

LoginRegister

Context

Edit this item

Statistics

View Usage Statistics

Sitios de Interés

Flexible Scheduling in a CPG Company

Thumbnail
View/Open
[PDF]Ver documento en PDF (3.228Mb)Visualizar
[Excel]Ver Resumen (54Kb)
Item Links
URI: http://hdl.handle.net/10818/10495
Export appointments
Exportar a BibTeXExportar a EndNoteExportar a MendeleyExportar a RISExportar a Zotero
Compartir
Statistics
View Usage Statistics
Metrics
Bibliographic cataloging
Show full item record
Author
Ardila Barreto, Natalia; Perez Santillan, Alejandro; Tablado, Francisco
Date
2014-05-06
Abstract
In fast growing markets like Latin America, supply networks are required to be flexible and responsive while keeping low inventory levels. The scope of this project is to identify key variables that could help a CPG company significantly reduce the Days Between Next Run (DBNR) metric, and to develop a model or process to assess and test how changing these variables would impact the production cycle and the associated inventory levels reducing the need for safety stock in the whole supply chain. By applying rescheduling model runs with high volume or long cycle time that affect the measure of DBNR will be reduced by split them achieving a reduction of current metric from 12 to 9 DBNR.
Keywords
Mercados -- América Latina
Inventarios -- Empresas -- América Latina
Cadena de suministros -- América Latina
Collections to which it belong
  • Especialización en Gerencia Logística [34]

Universidad de La Sabana

Código SNIES 1711

Personería Jurídica: Resolución 130 del 14 de enero de 1980. Ministerio de Educación Nacional.

Carácter académico: universidad.

Síguenos en nuestras redes

Contáctenos

Unidades Académicas

CESU

Política de Protección de datos

Institución de educación superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional.

Copyright 2017. Universidad de La Sabana. Todos los derechos reservados.

Campus del Puente del Común, Km. 7, Autopista Norte de Bogotá. Chía, Cundinamarca, Colombia.

Contact Center: 861 5555 / 861 6666. Apartado: 53753 Bogotá.