Algoritmo de optimización de colonias de hormigas para un problema de programación de flujo híbrido de dos etapas Bi-criterios
Enlaces del Item
URI: http://hdl.handle.net/10818/41300Visitar enlace: https://link.springer.com/arti ...
Visitar enlace: https://link.springer.com/cont ...
ISSN: 0956-5515
DOI: 10.1007/s10845-009-0370-y
Compartir
Estadísticas
Ver Estadísticas de usoCatalogación bibliográfica
Mostrar el registro completo del ítemFecha
2009-12-31Resumen
We consider the problem of scheduling jobs in
a hybrid flowshop with two stages. Our objective is to minimize both the makespan and the total completion time of
jobs. This problem has been little studied in the literature. To
solve the problem, we propose an ant colony optimization
procedure. Computational experiments are conducted using
random-generated instances from the literature. In comparison against other well-known heuristics from the literature,
experimental results show that our algorithm outperforms
such heuristics. Consideramos el problema de programar trabajos en un flowshop híbrido con dos etapas. Nuestro objetivo es minimizar tanto el tiempo de fabricación como el tiempo total de finalización de los trabajos. Este problema ha sido poco estudiado en la literatura. Para resolver el problema, proponemos un procedimiento de optimización de colonias de hormigas. Los experimentos computacionales se llevan a cabo utilizando instancias generadas al azar de la literatura. En comparación con otras heurísticas conocidas de la literatura, los resultados experimentales muestran que nuestro algoritmo supera a dichas heurísticas.
Ubicación
Intell Manuf 22, 815–822 (2011)