A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan
Enlaces del Item
URI: http://hdl.handle.net/10818/36944Visitar enlace: https://www.sciencedirect.com/ ...
DOI: 10.1016/j.cor.2016.04.009
Compartir
Estadísticas
Ver Estadísticas de usoCatalogación bibliográfica
Mostrar el registro completo del ítemFecha
2016Resumen
This paper considers the problem of scheduling a set of jobs subject to arbitrary release dates and sequence-dependent setup times on a single machine with the objective of minimizing the maximum completion of all the jobs, or makespan. This problem is often found in manufacturing processes such as painting and metalworking. A new mixed integer linear program (MILP) is firstly proposed. Because the problem is known to be NP-hard, a beam search heuristic is developed. Computational experiments are carried out using a well-known set of instances from the literature. Our results show that the proposed heuristic is effective in finding high quality solutions at low computational cost.
Palabras clave
Ubicación
Computers & Operations Research Volume 73, September 2016, Pages 132-140