Mostrar el registro sencillo del ítem

dc.contributor.authorMuñoz Villamizar, Andrés Felipe
dc.contributor.authorSantos, Javier
dc.contributor.authorMontoya Torres, Jairo Rafael
dc.contributor.authorAlvaréz, Maria Jesus
dc.date.accessioned07/18/2019 10:44
dc.date.available07/18/2019 10:44
dc.date.issued2019-02
dc.identifier.issn1923-2934
dc.identifier.otherhttps://www.researchgate.net/publication/330844563_Improving_effectiveness_of_parallel_machine_scheduling_with_earliness_and_tardiness_costs_A_case_study
dc.identifier.urihttp://hdl.handle.net/10818/36227
dc.description9 páginases_CO
dc.description.abstractThis paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing productivity. We defined a mixed-integer linear programming formulation of the parallel machine scheduling problem with four different objective functions in order to compare different scheduling configurations. Real data, from a plastic container manufacturing company located in the Basque Country (Spain), were used to validate this approach. A sensitivity analysis was performed with different production capacities and earliness/tardiness costs in order to evaluate the trade-offs between economic performance (i.e., costs) and the partial rates of OEE (i.e., quality, performance and availability). The objective of this study is to propose a guideline to help management make decisions regarding the measurement and improvement of scheduling effectiveness through contemplating earliness, tardiness and variable setup times.en
dc.formatapplication/pdfes_CO
dc.language.isoenges_CO
dc.publisherInternational Journal of Industrial Engineering Computationses_CO
dc.relation.ispartofseriesInternational Journal of Industrial Engineering Computations 10 (2019)
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.sourceUniversidad de La Sabanaes_CO
dc.sourceIntellectum Repositorio Universidad de La Sabanaes_CO
dc.subject.otherProduction sch edulingen
dc.subject.otherEarliness/tardinessen
dc.subject.otherOEEen
dc.subject.otherOptimizationen
dc.subject.otherMulti-objectiveen
dc.subject.otherKPI’sen
dc.titleImproving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case studyen
dc.typejournal articlees_CO
dc.type.hasVersionpublishedVersiones_CO
dc.rights.accessRightsopenAccesses_CO
dc.identifier.doi10.5267/j.ijiec.2019.2.001


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 InternationalExcepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International