dc.contributor.advisor | Montoya Torres, Jairo Rafael | |
dc.contributor.advisor | Vega Mejía, Carlos Alberto | |
dc.contributor.author | Carrillo Vega, Juan David | |
dc.date.accessioned | 2015-10-24T19:47:56Z | |
dc.date.available | 2015-10-24T19:47:56Z | |
dc.date.created | 2015 | |
dc.date.issued | 2015-10-24 | |
dc.identifier.citation | Bernal C. A. (2010). Metodología de la Investigación. Editorial Pearson Educación,
Colombia | |
dc.identifier.citation | Benjaafar, S., & Sheikhzadeh, M. (1997). Scheduling policies, batch sizes, and
manufacturing lead times. IIE transactions, 29(2), 159-166. | |
dc.identifier.citation | Boctor*, F. F., & Poulin, P. (2005). Heuristics for the N-product, M-stage, economic lot
sizing and scheduling problem with dynamic demand. International journal of
production research, 43(13), 2809-2828. | |
dc.identifier.citation | Boctor, F. F. (1987). The G-group heuristic for single machine lot scheduling.
International Journal of Production Research, 25(3), 363-379. | |
dc.identifier.citation | Bertrand, J. W. M. (1985). Multiproduct optimal batch sizes with in-process
inventories and multi work centers. IIE Transactions, 17(2), 157-163. | |
dc.identifier.citation | Carreras, P. I. V., García-Sabater, J. P., Marín-García, J. A., & García-Sabater, J. J.
(2008). ELSP variants: a review. In II International Conference on Industrial
Engineering and Industrial Management (pp. 1215-1225). | |
dc.identifier.citation | Carreras, P. I. V., & Sabater, J. P. G. (2006). El Problema de la Programación del
Lote Económico (ELSP): Una revisión de la literatura. In X Congreso de Ingeniería de
Organización | |
dc.identifier.citation | Chatfield, D. C. (2007). The economic lot scheduling problem: A pure genetic search
approach. Computers & Operations Research, 34(10), 2865-2881. | |
dc.identifier.citation | Drexl, A., & Kimms, A. (1997). Lot sizing and scheduling—survey and extensions.
European Journal of Operational Research, 99(2), 221-235. | |
dc.identifier.citation | Eilon, S. (1959). Economic batch-size determination for multi-product scheduling. OR,
217-227 | |
dc.identifier.citation | Erlenkotter, D. (1990). Ford Whitman Harris and the economic order quantity model.
Operations Research, 38(6), 937-946. | |
dc.identifier.citation | Gutiérrez, O. P. (2009). Un enfoque multicriterio para la toma de decisiones en la
gestión de inventarios. Cuadernos de Admón. Pontificia Universidad Javeriana,
22(38), 169-187. | |
dc.identifier.citation | Harris, F.W., 1913.How many parts to make at once. Fact. Mag. Manag.10(2), 135–
136(152). . | |
dc.identifier.citation | Holmbom, M., & Segerstedt, A. (2014). Economic Order Quantities in production:
From Harris to Economic Lot Scheduling Problems. International Journal of
Production Economics, 155, 82-90. | |
dc.identifier.citation | Mirabi, M. (2011). A hybrid simulated annealing for the single-machine capacitated
lot-sizing and scheduling problem with sequence-dependent setup times and costs
and dynamic release of jobs. The International Journal of Advanced Manufacturing
Technology, 54(9-12), 1109-1119. | |
dc.identifier.citation | Mokhlesian, M., Fatemi Ghomi, S. M. T., & Jolai, F. (2010). Economic lot scheduling
problem with consideration of money time value. International Journal of Industrial
Engineering Computations, 1(2), 121-138. | |
dc.identifier.citation | Montoya Torres, Jairo Rafael (2015). Logística de producción: modelos y métodos de
programación de operaciones, Cap 1. | |
dc.identifier.citation | Pinedo, M. (2005) Planning and scheduling in manufacturing and services. New York:
Springer. | |
dc.identifier.citation | Raza, A. S., & Akgunduz, A. (2008). A comparative study of heuristic algorithms on
economic lot scheduling problem. Computers & Industrial Engineering, 55(1), 94-109. | |
dc.identifier.citation | Sanchís, R., Saiz, E., Castellano, E., & Poler, R. (2012). Estrategias de
cumplimentación de pedidos en el sector de fabricación de bienes de equipo. Un
estudio empírico. Dirección y Organización, (45), 84-90. | |
dc.identifier.citation | Slack, N., Chambers, S., & Johnston, R. (2010). Operations management. Pearson
Education. | |
dc.identifier.citation | Winands, E. M. M., Adan, I. J. B. F., & Van Houtum, G. J. (2005). The stochastic
economic lot scheduling problem: a survey. Beta, Research School for Operations
Management and Logistics. | |
dc.identifier.uri | http://hdl.handle.net/10818/19648 | |
dc.description | 71 Páginas incluye diagramas | es_CO |
dc.description.abstract | El proyecto proponer la aplicación de un modelo matemático que permita calcular el tamaño óptimo de lote para el plan de producción en una compañía de manufactura de productos bienes de consumo masivo, de igual forma busca con el modelo optimizar los costos de producción y la disponibilidad de producto para despacho en tiempo cero, respetando las restricciones de capacidad de almacenamiento en bodega y que garantice la eficiencia del proceso productivo, pero buscando satisfacer la demanda. Finalmente se compara el resultado obtenido con el modelo con un plan de producción real. | es_CO |
dc.language.iso | spa | es_CO |
dc.publisher | Universidad de La Sabana | |
dc.source | Universidad de La Sabana | |
dc.source | Intellectum Repositorio Universidad de La Sabana | |
dc.subject | Producción en masa -- Colombia | |
dc.subject | Administración de la producción -- Colombia | |
dc.subject | Manufacturas | |
dc.title | Cálculo del tamaño óptimo de lote de producción en una línea manufactura de bienes de consumo | es_CO |
dc.type | masterThesis | es_CO |
dc.publisher.program | Maestría en Gerencia de Operaciones | es_CO |
dc.publisher.department | Escuela Internacional de Ciencias Económicas y Administrativas | es_CO |
dc.identifier.local | 175941 | |
dc.identifier.local | TE07803 | |
dc.type.local | Tesis de maestría | |
dc.type.hasVersion | publishedVersion | es_CO |
dc.rights.accessRights | openAccess | es_CO |
dc.creator.degree | Magíster en Gerencia de Operaciones | es_CO |