Mostrar el registro sencillo del ítem

dc.contributor.advisorMontoya Torres, Jairo Rafael
dc.contributor.authorSánchez Herrera, David Santiago
dc.date.accessioned2016-10-19T21:12:56Z
dc.date.available2016-10-19T21:12:56Z
dc.date.created2016
dc.date.issued2016
dc.identifier.citationAlfares, H. K. (2004). Survey, Categorization, and Comparison of Recent Tour Scheduling Literature. Annals of Operati ons Research , 127 , 145 – 175.
dc.identifier.citationAngel, J., Ramalhinho, H., Lourenco, M., Luo, R., & Castella, Q. (2013). Using Iterated Local Search for Solving the Flow - Shop Problem : International Transactions in Operational Research .
dc.identifier.citationArroyo, J. E. C., & De Souza Pereira, A. A. (2011). A GRASP heuristic for the multi - objective permutation flowshop scheduling problem. International Journal of Advanced Manufacturing Technology , 55 (5 - 8 ), 741 – 753.
dc.identifier.citationBaines, T. S., & Kay, J. M. (2002). Human performance modelling as an aid in the process of manufacturing system design: A pilot study. International Journal of Production Research , 40 (February 2015), 2321 – 2334.
dc.identifier.citationBank, M., Fatemi Ghomi, S. M. T., Jolai, F., & Behnamian, J. (2012a). Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration. Advances in Engineering Software , 47 (1), 1 – 6.
dc.identifier.citationBank, M., Fatemi Ghomi, S. M. T ., Jolai, F., & Behnamian, J. (2012b). Two - machine flow shop total tardiness scheduling problem with deteriorating jobs. Applied Mathematical Modelling , 36 (11), 5418 – 5426.
dc.identifier.citationBenavides, A. J., Ritt, M., & Miralles, C. (2014). Flow shop scheduling with heterog eneous workers. European Journal of Operational Research , 237 (2), 713 – 720.
dc.identifier.citationBentefouet, F., & Nembhard, D. a. (2013). Optimal flow - line conditions with worker variability. International Journal of Production Economics , 141 (2), 675 – 684.
dc.identifier.citationBoudreau, J. W., Ho pp, W., Mcclain, J. O., & Thomas, L. J. (2002). On the Interface Between Operations and Human Resources Management On the Interface Between Operations and Human Resources.
dc.identifier.citationBozorgirad, M. A., & Logendran, R. (2016). A comparison of local search algorithms w ith population - based algorithms in hybrid flow shop scheduling problems with realistic characteristics. International Journal of Advanced Manufacturing Technology , 83 (5 - 8), 1135 – 1151.
dc.identifier.citationCheng, M. (2013). Flowshop Scheduling Problems with a Position - Dependen t Exponential Learning Effect.
dc.identifier.citationCheng, M., Sun, S., & He, L. (2007). Flow shop scheduling problems with deteriorating jobs on no - idle dominant machines. European Journal of Operational Research , 183 (1), 115 – 124.
dc.identifier.citationCheng, M., Tadikamalla, P. R., Shang, J., & Zhang, B. (2015). Two - machine flow shop scheduling with deteriorating jobs: Minimizing the weighted sum of makespan and total completion time. Journal of the Operational Research Society , 66 (5), 709 – 719.
dc.identifier.citationCheng, M., Tadikamalla, P. R., Shang, J., & Zhang, S. (2014). Bicriteria hierarchical optimization of two - machine flow shop scheduling problem with time - dependent deteriorating jobs. European Journal of Operational Research , 234 (3), 650 – 657. http://doi.org/10.1016/j.ejor.2013.09.033
dc.identifier.citationCosta, A., Cappadonna, F. A., & Fichera, S. (2014). Joint optimization of a flow - shop group scheduling with sequence dependent set - up times and skilled workforce assignment. International Journal of Production Research , 52 (9), 2696 – 2728.
dc.identifier.citationDaniels, R. L., Mazzola, J. B., & Shi, D . (2004). Flow Shop Scheduling with Partial Resource Flexibility. Management Science , 50 (5), 658 – 669. http://doi.org/10.1287/mnsc.1040.0209
dc.identifier.citationDenyer, & Tranfield. (2009). Producing a Systematic Review
dc.identifier.citationDong, X., Chen, P., & Huang, H. (2011). An improved iter ated local search algorithm for the permutation flowshop problem with total flowtime. Lecture Notes in Electrical Engineering , 122 LNEE , 41 – 48.
dc.identifier.citationEdie, L. C. (1954). Traffic delays at toll booths. Operations Research Society of America , 2 , 107 – 138.
dc.identifier.citationFesta, P., & Resende, M. G. C. (2009). An annotated bibliography of GRASP – Part II: Applications. International Transactions in Operational Research , 16 (1), 131 – 172.
dc.identifier.citationFichera, S., Costa, A., & Cappadonna, F. (2015). Scheduling jobs families with learning effect o n the setup. Advances in Operations Research , 2015 .
dc.identifier.citationFraminan, J. M., Gupta, J. N. D., & Leisten, R. (2004). A review and classification of heuristics for permutation flow - shop scheduling with makespan objective. Journal of the Operational Research Society , 55 (12), 1243 – 1255.
dc.identifier.citationGao, Q., & Lu, X. (2014). Two - Machine Flow Shop Scheduling With Individual Operation’S Rejection. Asia - Pacific Journal of Operational Research , 31 (01), 1450002.
dc.identifier.citationGawiejnowicz, S. (2008). Time - Dependent Scheduling . Springer .
dc.identifier.citationGourgand, M., Grangeon, N., & Norre, S. (2003). A contribution to the stochastic flow shop scheduling problem. European Journal of Operational Research , 151 (2), 415 – 433.
dc.identifier.citationGupta, J. N. D., & Stafford, E. F. (2006). Flowshop scheduling research after five decades. Eur opean Journal of Operational Research , 169 (3), 699 – 711. http://doi.org/10.1016/j.ejor.2005.02.001
dc.identifier.citationHeizer, J., & Render, B. (2007). Dirección de la producción y de operaciones. Decisiones estratégicas . Dirección de la producción y de operaciones. Decisiones estratégicas (8th ed.). Prentice Hall.
dc.identifier.citationHuang, X., & Wang, J. - J. (2015). Machine scheduling problems with a position - dependent deterioration. Applied Mathematical Modelling , 39 (10 - 11), 2897 – 2908.
dc.identifier.citationHuq, F., Cutright, K., & Martin, C. (2004). Employee schedu ling and makespan minimization in a flow shop with multi - processor work stations: a case study. Omega , 32 (2), 121 – 129.
dc.identifier.citationİşler, M. C., Toklu, B., & Çelik, V. (2009). The Minimization Of Absolute Deviation From Common Due Date in Two Machine FlowShop Schedul ing With Learning Effect. Journal of the Faculty of Engineering and Architecture of Gazi University , 24 (2), 351 – 357. Retrieved from http://www.scopus.com/inward/record.url?eid=2 - s2.0 - 67651097931&partnerID=tZOtx3y1
dc.identifier.citationİşler, M. C., Toklu, B., & Çelik, V. (2011 ). Scheduling in a two - machine flow - shop for earliness/tardiness under learning effect. The International Journal of Advanced Manufacturing Technology , 61 (9 - 12), 1129 – 1137.
dc.identifier.urihttp://hdl.handle.net/10818/27627
dc.description75 Páginas.es_CO
dc.description.abstract​La programación de la producción es un proceso crítico para las empresas manufactureras y de servicios, no solo para directivos, también para operarios. La teoría clásica de programación de la producción establece que los trabajadores tienen las mismas características, competencias y, en consecuencia, el mismo nivel de productividad. Sin embargo, desde la perspectiva de programación de personal, las teorías clásicas resultan irreales e imprácticas. Es bien sabido que cada persona tiene competencias y habilidades distintas. Adicionalmente, la fatiga es un factor que incide significativamente en el deterioro de la productividad durante cualquier tipo de actividad laboral. La inclusión del factor mencionado en los programas de producción permite hacer cálculos reales de la productividad de los sistemas, considerando la presencia de seres humanos dentro de los procesos productivos. Este trabajo considera el problema de la programación de la producción con recursos (operarios) en serie y con deterioro de la productividad (en función de la posición de inicio de cada trabajo) y busca analizar el impacto que genera variar dicho deterioro en los programas resultantes y en la asignación del personal disponible, a través del análisis de dos objetivos de desempeño de manera independiente: tiempo total de terminación (𝐶𝑚𝑎𝑥) y tardanza máxima (𝑇𝑚𝑎𝑥). Se proponen métodos de solución exactos, heurísticos y meta-heurísticos.es_CO
dc.formatapplication/pdfes_CO
dc.language.isospaes_CO
dc.publisherUniversidad de La Sabanaes_CO
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.sourceUniversidad de la Sabana
dc.sourceIntellectum Repositorio Universidad de la Sabana
dc.subjectIndustrias manufactureras -- Administración
dc.subjectIndustrias de servicios -- Administración
dc.subjectAdministración de la producción
dc.subjectPlanificación de la producción
dc.subjectTeoría del punto crítico (Análisis matemático)
dc.subjectEstudio de tiempos
dc.subjectTrabajo calificado
dc.titleProgramación de la producción en flow-shops con productividad variable en industrias con mano de obra intensivaes_CO
dc.typemasterThesises_CO
dc.publisher.programMaestría en Gerencia de Operacioneses_CO
dc.publisher.departmentEscuela Internacional de Ciencias Económicas y Administrativases_CO
dc.identifier.local262699
dc.identifier.localTE08573
dc.type.localTesis de maestría
dc.type.hasVersionpublishedVersiones_CO
dc.rights.accessRightsrestrictedAccesses_CO
dc.creator.degreeMagíster en Gerencia de Operacioneses_CO


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 InternationalExcepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 International