TY - GEN AU - Muñoz Villamizar, Andrés Felipe AU - Santos, Javier AU - Montoya Torres, Jairo Rafael AU - Alvaréz, Maria Jesus PY - 2019 SN - 1923-2934 UR - http://hdl.handle.net/10818/36227 AB - This paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing... LA - eng PB - International Journal of Industrial Engineering Computations KW - Production sch eduling KW - Earliness/tardiness KW - OEE KW - Optimization KW - Multi-objective KW - KPI’s TI - Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study DO - 10.5267/j.ijiec.2019.2.001 ER -