Relief operations as a multi-project: Colombian case
Las operaciones de socorro como multiproyecto: caso colombiano
Enlaces del Item
URI: http://hdl.handle.net/10818/51088Visitar enlace: http://m.growingscience.com/be ...
ISSN: 1923-2934
DOI: 10.5267/j.ijiec.2019.5.002
Compartir
Estadísticas
Ver Estadísticas de usoCatalogación bibliográfica
Mostrar el registro completo del ítemFecha
24/05/2019Resumen
The purpose of this paper is to present the relief operations (RO), responding to a sudden, natural, national disaster (SNND) as a multi-mode resource-constrain multi-project scheduling problem (MRCMPSP). A conceptual framework at a strategic level is constructed and the Colombian RO for an earthquake response is shown as an illustrative case. We concluded that RO can be addressed as a MRCMPSP and that for Colombian case, it is a convenient way to board it. Addressing RO as a MRCMPSP allows managers to implement different project scheduling tools successful in other contexts El propósito de este trabajo es presentar las operaciones de socorro (RO), respondiendo a una situación repentina, natural,
desastre nacional (SNND) como un problema de programación de múltiples proyectos con restricciones de recursos multimodo
(MRCMPSP). Se construye un marco conceptual a nivel estratégico y la RO colombiana
para una respuesta a un terremoto se muestra como un caso ilustrativo. Llegamos a la conclusión de que RO puede ser
direccionado como MRCMPSP y que para el caso colombiano, es una forma conveniente de abordarlo.
Abordar RO como MRCMPSP permite a los gerentes implementar diferentes herramientas de programación de proyectos
exitoso en otros contextos
Ubicación
International Journal of Industrial Engineering Computations, 11(1), 153-172.
Colecciones a las que pertenece
- Facultad de Ingeniería [506]